Turkish minister reveals Zangezur corridor commission timeline
The Zangezur corridor will be fully commissioned in 2029-2030, Turkish Minister of Transport and Infrastructure Abdulkadir Uraloglu said.
The Zangezur corridor will be fully commissioned in 2029-2030, Turkish Minister of Transport and Infrastructure Abdulkadir Uraloglu said.
The Russian side has closed the passage for ships loaded outside the country through the Kerch Strait to the Sea of Azov, the Main Directorate for Maritime Affairs under the Ministry of Transport and Infrastructure of Turkey reports. …